Customization: | Available |
---|---|
Application: | Power |
Phase: | Three |
Still deciding? Get samples of US$ 400/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Installation
Remove the M5 bolt in the middle of the handle,then pull down the handle,round nut,gasket, gear one by one. Put the switch into the φ34 holes on the tank cover. Then fit on the gear, gasket,round nut,handle, fixed the M5 bolt.(Notice: gasket is under the tank cover of transformer ).
Notice
1) Use of enivronment temperature: in air -40ºC~40ºC,in oil -40ºC~110ºC
2) Installation places should not be explosive and corrosive gases.
3) Before assembling the tapping switch, must check up whether the tapping switch conforms to the type specification of the transformer in order to avoid causing the loss that should not occur.
4) The leading wire of the terminal of the tapping switch mustn't make the tapping switch deformed because of stressing and the leading wire and the moving part should have enough moving space (usually 10mm) in order to avoid movement hindered.
5) The maximum drying temperature of this switch is 110ºC, if after drying,If the contact resistance is too large, should be running tap back several times.
6) When the switch is in the maximum gear position, strictly forbid wrenching the handle to the limit direction.
7) Before assembling and switching should make 3~5 times of transfer on the tapping position of the tapping switch, when the tapping has completed the regulating transfer, the transfer handle must be put into the flange locating slot.