Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)

Product Details
Customization: Available
Application: Power
Phase: Three
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
113
Year of Establishment
2014-05-05
  • Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)
  • Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)
  • Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)
Find Similar Products

Basic Info.

Model NO.
WSLII3-125-10
Core
Shell-type Transformer
Cooling Method
Oil-immersed Type Transformer
Winding Type
High Voltage
Usage
Power Transformer
Frequency Characteristics
High Frequency
Shape of Core
High Voltage
Brand
Anhuang
Transport Package
Packing in Carton
Specification
WSLII3-125-10
Trademark
ANHUANG
Origin
China
HS Code
8504901900
Production Capacity
1000 PCS/Month

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 10.00cm
Package Gross Weight
10.000kg

Product Description

Oil Immersed Load Break Switch


    With the transformer oil as insulation and arc extinction medium and energy storing spring operating mechanism, this two-position oil immersed load switch applies to the combined transformer with 50Hz frequency and 25kV rated voltage, it is capable to turn on and off the load current. Equipped with ON and OFF two positions, the clockwise turn is "ON", while anticlockwise is "OFF", the rotation angle should be controlled within 90°. In addition, it can be suitable for end power distribution system or ring-network power distribution system if equipped extra configurations.

Main technical parameters
Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)
 
Overall dimension 
Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)
Reservation installation size for transformer housing 
Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)

Load switch installation

    Before installation, please check whether the switching motion is flexible and accurate carefully, only after confirmed to be under good condition, the installation can be implemented, in addition, the load switch must be dried under 65±5ºCcondition by 24h.

Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)

5) After installation and connection, it is suggested to carry out "open" and "close" operation to check if the switch can be moved flexibly and if the position indication is correct, if any abnormal, please check the installation of switch and the connection of busbar according to article 2 and 4.
 

Points for attention

 

1) This load switch can be used to open or close rated current only, while the application for closing and opening the failure current. If over rated current, forbidden to operate switch.

2) Only the special insulated operating arm can be used to operate this load switch to ensure personal safety.

Connection Diagram 
Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)



Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)Tap Changer Oil Immersed Load Break Switch (WSLII3-125-10)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now